Schenley_Tunnel

Schenley Tunnel

Schenley Tunnel (also known as the Neville Street Tunnel[1] and Pittsburgh Junction Railroad Tunnel) is a railroad tunnel in Pittsburgh, Pennsylvania, United States. The tunnel runs beneath Neville Street in the city's North Oakland neighborhood; the south portal is at the upper end of Junction Hollow emerging from under Filmore St., the north emerges from under Centre Ave. into a ravine that opens into Skunk Hollow, between North Oakland and Bloomfield.

Quick Facts Overview, Other name(s) ...

Schenley Tunnel measures 2,872 feet (875 m) in length and runs about 70 feet (21 m) beneath Neville Street. It carries CSX Transportation's P&W Subdivision. The Allegheny Valley Railroad, a short-line railroad, uses the tunnel for regional services. Amtrak's Capitol Limited also uses the tunnel when entering and leaving the city.

History

Excavation on the tunnel began about May 1883[2] and continued for nine months.[3] By August 1883, a vertical shaft reached the tunnel's midpoint, and additional excavation began from the inside, working in both directions.[4] In May 1884, brick masons were hired to build the arched passage lining the tunnel.[5] The track was completed on September 24, 1884[3] and the Pittsburgh Daily Post reported that an informal opening for involved business leaders was held September 30, 1884, but noted that about 25 feet (7.6 m) of the tunnel remained to be bricked.[6][7] The official opening was delayed until December 1884, when the Junction Railroad's bridge across the Allegheny River and Herr's Island was opened, completing the connecting railroad.[8]

Shaw, Stearns & Norris, railroad builders from Columbus, Ohio were the contractors.[8] The entire Junction Railroad, about four miles (6.4 km) long, including the tunnel and a bridge crossing the Allegheny River at 33rd Street, cost about $1.9 million (equivalent to $64 million in 2023).[3] While the original Schenley tunnel is still in use, the bridge was replaced in 1920.[9]

The south portal in 1914.

References

  1. Grata, Joe (February 2016). "Underground Pittsburgh: Explore our City of Tunnels". Pittsburgh Magazine.
  2. "Capital and labor notes". Pittsburgh Commercial Gazette. May 19, 1883. p. 2. Retrieved February 25, 2018 via Newspapers.com. Free access icon
  3. "Ready for work: The last rail placed on the Junction Railroad". Pittsburgh Commercial Gazette. September 25, 1884. p. 2. Retrieved February 25, 2018 via Newspapers.com. Free access icon
  4. "Work on the Junction Tunnel". Pittsburgh Commercial Gazette. August 8, 1883. p. 2. Retrieved February 25, 2018 via Newspapers.com. Free access icon
  5. "Wanted — 20 brickmasons". Pittsburgh Commercial Gazette. May 19, 1884. p. 3. Retrieved February 25, 2018 via Newspapers.com. Free access icon
  6. "Jaunt on the Junction: The connecting link of two great roads informally opened". Pittsburgh Daily Post. October 1, 1884. p. 4. Retrieved February 25, 2018 via Newspapers.com. Free access icon
  7. "Death takes noted capitalist". Pittsburgh Gazette Times. December 6, 1906. p. 2. Retrieved February 25, 2018 via Newspapers.com. Free access icon
  8. "The great short cut: Finishing touches to the Junction Road". The Evening Penny Press. Pittsburgh. December 11, 1884. p. 1. Retrieved February 25, 2018 via Newspapers.com. Free access icon
  9. "Railroad news: Spans rolled into place". Pittsburgh Post. September 28, 1920. p. 14. Retrieved March 1, 2018 via Newspapers.com. Free access icon

Share this article:

This article uses material from the Wikipedia article Schenley_Tunnel, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.