Sutong_Yangtze_River_Bridge

Sutong Yangtze River Bridge

Sutong Yangtze River Bridge

Cable-stayed bridge, China


The Sutong Yangtze Bridge (Chinese: 苏通长江大桥; Wu Chinese pronunciation: [sutʰoŋ dadʒɔ], pinyin: Sūtōng Chángjiāng Dàqiáo) is a cable-stayed bridge that spans the Yangtze in China between Nantong and Changshu, a satellite city of Suzhou, in Jiangsu province.

Quick Facts Sutong Bridge 苏通长江大桥, Coordinates ...

Design and construction

The Sutong Yangtze River Bridge was designed by Dr. Robin Sham, CBE, FICE, a Hong Kong-born and British-based structural engineer who specializes in bridges.[1] With a span of 1,088 metres (3,570 ft), it was the cable-stayed bridge with the longest main span in the world from 2008 to 2012. Its two side spans are 300 metres (980 ft) each, and there are also four small cable spans. The bridge received the 2010 Outstanding Civil Engineering Achievement award (OCEA) from the American Society of Civil Engineers.[2][3]

Two towers of the bridge are 306 metres (1,004 ft) high and thus the fifth tallest in the world. The total bridge length is 8,206 metres (26,923 ft). Construction began in June 2003, and the bridge was linked up in June 2007. The bridge was opened to traffic on 25 May 2008[4] and was officially opened on 30 June 2008.[5] Construction has been estimated to cost about US$1.7 billion.

The completion of the bridge shortens the commute between Shanghai and Nantong, previously a four-hour ferry ride, to about an hour.[6] It brings Nantong one step closer to becoming an important part of the Yangtze Delta economic zone, and has further attracted foreign investors into the city. The bridge is also pivotal in the development of poorer northern Jiangsu regions.

The tower is an inverted Y-shaped reinforced concrete structure with one connecting girder between tower legs. The bridge deck is a steel box girder with internal transverse and longitudinal diaphragms and fairing noses at both sides of the bridge deck. The total width of the bridge deck is 41 metres including the fairing noses.

The construction of Zhaodian-Huangdu Section of Nantong-Shanghai Railway was commenced in March 2014. Following the completion of subgrade, bridges, mainline track-laying, and “communication, signal, power and electrification” works, the integrated commissioning & test began on 20 April 2020 [7]

See also


References

  1. "Robin Sham".
  2. "Transportation". AECOM. Archived from the original on 2010-01-02. Retrieved 2010-04-02.
  3. Sutong Bridge Opens to Traffic. Retrieved 2009-12-11. Archived January 31, 2009, at the Wayback Machine
  4. Erik Sofge (December 10, 2009). "The Top 5 Engineering Projects of 2009". Popular Mechanics. Archived from the original on December 13, 2009. Retrieved 2009-12-11.
  5. "China: Nantong-Shanghai Railway starts trial operation". UIC e-News #China: Nantong-Shanghai Railway starts trial operation. Retrieved 2020-06-29. {{cite web}}: Check |url= value (help)

Share this article:

This article uses material from the Wikipedia article Sutong_Yangtze_River_Bridge, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.