Tai Lam Tunnel is a 3.8 km (2.4 mi) dual 3-lane tunnel. The total length of the R3CPS (the tolled area) is 10.1 km (6.3 mi).
The tolled area, with two entrances/exits at the south end, Ting Kau Bridge and Tuen Mun Road at Ting Kau, crosses Tai Lam Country Park to its north end at Pat Heung.
Located at Pat Heung and about 1 km (0.62 mi) from the north tunnel portal, the toll plaza consists of 22 tollbooths, 16 of which are for manual tolls and 6 are Autotoll lanes.
Tai Lam Tunnel is a Build-Operate-Transfer (B.O.T) project with a franchise period of 30 years (including construction period).[1] Its total construction cost was HK$7.25 billion.[citation needed] Construction on Tai Lam Tunnel started on 13 March 1995 and was officially opened to traffic on 25 May 1998[2] to match with the opening of the new Hong Kong International Airport.
The designed traffic capacity of Tai Lam Tunnel is 140,000 vehicles per day.[citation needed] In 2011/2012, the average daily traffic was over 54,000 vehicles.[3]
According to the statistics from the Transport Department of the Government of Hong Kong, Tai Lam Tunnel has higher-than-average safety records. In 2011, the accident rate per million vehicle-km was just 0.07.[4]
The tunnel is well known for its high tolls similar to the Western Harbour Crossing. Its toll for private cars is HK$55,[5] making it the second most expensive tunnel in Hong Kong; the most expensive is the Western Harbour Crossing at HK$60. For coaches, it is the highest in the city, about 4 times higher than the longer Tate's Cairn Tunnel.
More information Category, Vehicle ...
Category | Vehicle | Standard toll (HK$) | Concessionary toll (current)[6][7] |
1 | Motorcycle | 60 | 22 |
2 | Private car | 65 | 48 |
Taxi |
3 | Private light bus | 180 | 100 |
4 | Light goods vehicle (less than 5.5 tonnes) | 180 | 49 |
5 | Medium goods vehicle (5.5 to 24 tonnes) | 190 | 55 |
6 | Heavy goods vehicle (more than 24 tonnes) | 210 | 60 |
7 | Single-decker bus | 180 | 143 |
8 | Double-decker bus | 195 | 168 |
| Additional axle | 70 | Free |
Close
| This section does not cite any sources. (November 2012) |
The tunnel company performed compensatory tree planting at a rate of three replacement saplings for each tree felled. In total, 250,000 trees, 150,000 shrubs and 60,000 climbing plants were planted during the construction period.
As to conservation of wildlife, there is a small tunnel constructed at the south portal of Tai Lam Tunnel, mainly for small wild animals in this area to commute in the valley freely, allowing them to maintain their habituation.
To keep in pace with technology development, Tai Lam Tunnel has gradually replaced traditional light bulbs with light-emitting diodes (LEDs). The indicator lighting signals inside the tunnel tubes and at the toll plaza as well as the illuminating system in the administration building have thus been replaced for reducing carbon emission.