Tavistock_MRT_station

Tavistock MRT station

Tavistock MRT station

Future Mass Rapid Transit station in Singapore


Tavistock MRT station is a future underground Mass Rapid Transit station on the Cross Island line located in Serangoon planning area, Singapore.

Quick Facts CR10 Tavistock达维士笃தெவிஸ்தொக், General information ...

It will be located underneath Ang Mo Kio Avenue 3, at the junction of Tavistock Avenue and Ang Mo Kio Industrial Park 2 as well as being in the vicinity of industries at Ang Mo Kio Industrial Park 2, residential developments around Tavistock, and community amenities such as Chen Su Lan Methodist Children's Home, Ling Kwang Home, Cheshire Home, Serangoon Gardens Food Centre and the French School of Singapore (Lycée Français de Singapour).

History

On 25 January 2019, the Land Transport Authority (LTA) announced that Tavistock station would be part of the proposed Cross Island line (CRL). The station will be constructed as part of Phase 1, which will consist of 12 stations from the Aviation Park to Bright Hill stations. It was expected to be completed in 2029.[1][2][3] However, the restrictions imposed on construction works due to the COVID-19 pandemic led to delays and the CRL1 completion date was pushed by one year to 2030.[4] A second stage from Bright Hill to Jurong Lake District stations is targeted to open in 2032.

On 13 January 2022, the LTA awarded Contract CR115 to Sato Kogyo (S) at S$407 million (US$298.3 million).[5] The contract involves the design and construction of the station and associated tunnels.[6] Construction works for the station and tunnels are scheduled to begin in the first quarter of 2022, and expected to be completed by 2030. Due to the station's location in a built-up area, the launch shaft for the tunnel boring machine will be at a distance from the station site. Tunnelling through old alluvium soil, the boring machine has to be closely monitored for wear and tear.[5][7][8]


References

  1. "Joint News Release by the Land Transport Authority (LTA) & SLA – Cross Island Line 1: New Links by 2029". LTA (Press release). 25 January 2019. Archived from the original on 5 March 2020. Retrieved 5 March 2020.
  2. Tan, Christopher (25 January 2019). "First phase of Cross Island MRT line finalised; will have 12 stations". The Straits Times. Archived from the original on 5 March 2020. Retrieved 5 March 2020.
  3. Yusof, Amir (25 January 2019). "First phase of Cross Island Line to open by 2029 with 12 stations". Channel NewsAsia. Archived from the original on 5 March 2020. Retrieved 5 March 2020.
  4. "Construction of Serangoon North, Tavistock MRT stations to begin in second quarter of 2022". CNA. 13 January 2022. Archived from the original on 15 January 2022. Retrieved 15 January 2022.
  5. "Contact CR115" (PDF). LTA. Archived (PDF) from the original on 29 December 2021. Retrieved 15 January 2022.
  6. "LTA Awards Two Civil Contracts for Cross Island Line Phase 1". LTA. 13 January 2022. Archived from the original on 13 January 2022. Retrieved 15 January 2022.
  7. Toh, Ting Wei (13 January 2022). "LTA awards 2 contracts worth $861m for construction of Serangoon North, Tavistock MRT stations". The Straits Times. Archived from the original on 15 January 2022. Retrieved 15 January 2022.

Share this article:

This article uses material from the Wikipedia article Tavistock_MRT_station, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.