Wind power in Belarus remains underutilized as of 2021 despite its significant potential.[1] Together with solar power, wind power is the most important sector of renewable energy in Belarus. As of 2019, there is one 106MW wind farm.[1]:29 New wind power is hindered by government quotas[2] and the lack of auctions.[1]

Wind generator near Hrabnyky

Energy transition

In a September 2022 article, the United Nations Development Programme (UNDP) highlighted the country's efforts to prioritize carbon-neutral technologies in its energy mix to reduce reliance on imports. The government aims for a 9% share of renewable energy by 2035, as outlined in the Concept of Energy Security. Wind energy, with favorable speeds and declining costs, is emerging as an alternative. The UNDP, in collaboration with Belarus, studied measures to encourage private investment in wind power, aiming to advance climate goals under the Paris Agreement.[3]

Wind resources

The country has already identified 1640 points where it is possible to install wind power plants, although the wind speed over the territory of Belarus is on average no more than 3.5–5 m/s, and for the economic benefit of wind turbines it should reach 7–12 m/s. The best conditions for wind power are observed on the hills near Navahrudak, Oshmiansk [uk], Minsk, and Orsha.[4]

Main enterprises

Until the year 2010, individual units already operated in the Minsk and Grodno regions. By 2017, the largest of the wind energy facilities is Navahrudak wind park, which belongs to the RUE branch «Grodnoenergo» Lida energy networks. The first wind generator appeared here near the village Hrabnyky in 2011. The windbreak showed good results. In 2016, close to installed 5 similar installations of the Chinese company «HEAG».[5] The Creation of a wind park cost the state 13 million dollars. Annual electricity generation is about 22 million kWh. Such an amount of generated energy allows us to save 4.5 million cubic meters of gas per year (700 000-800 000 dollars). The station is serviced by 10 certified employees of "Grodnoenergo".[6]

In 2017, there were about 47 facilities in the country where wind turbines are operated with a total installed capacity of 84 MW.[7] By 2020, the commissioning of wind power stations is expected in the Smorgon (15 MW), Oshmyany (25 MW), Liozno (50 MW) and Dzerzhinsky (160 MW) regions.[8]

According to forecasts, by 2020, the power capacity of wind turbines will be 289 MW. By 2030 - about 500 MW.[9]


References

  1. "Renewables Readiness Assessment: Belarus". /publications/2021/Jul/Renewables-Readiness-Assessment-Belarus. 29 July 2021. Retrieved 2021-12-23.
  2. Novikau, Aliaksandr (2022-01-01). "Current challenges and prospects of wind energy in Belarus". Renewable Energy. 182: 1049–1059. doi:10.1016/j.renene.2021.11.011. ISSN 0960-1481. S2CID 243918286.
  3. "DREI Belarus". UNDP. Retrieved 2024-02-14.
  4. Внедрить, но не навредить // Энергетика Белоруссии : газета. — 2017. — 29 ноябрь (№ 22). — С. 3.
  5. Шарухо И. Н. Сдвиги в энергетике Белоруссии в целях устойчивого развития / И. Н. Шарухо, М. А. Потоцкий, В. Г. Хомяков // Итоги научных исследований ученых МГУ имени А. А. Кулешова 2016 г. — Могилёв, 2017. — С. 165—167.

Sources


Share this article:

This article uses material from the Wikipedia article Wind_power_in_Belarus, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.