Lianyungang–Zhenjiang_high-speed_railway

Lianyungang–Zhenjiang high-speed railway

Lianyungang–Zhenjiang high-speed railway

High speed rail line in China


The Lianyungang–Zhenjiang high-speed railway is a high-speed railway in China. It has a design speed of 250 kilometres per hour (160 mph).

Quick Facts Lianyungang–Zhenjianghigh-speed railway 连镇客运专线, Overview ...

History

In November 2014, construction was expected to take 4.5 years.[1]

The section from Lianyungang to Huai'an opened on 16 December 2019.[2] The remainder was expected to open on 3 December 2020, however this did not go ahead.[3] It opened on 11 December.[4][5]

Route

Heading south from Lianyungang, the railway splits from the Qingdao–Yancheng railway after Dongji and continues south, serving Guanyun, Guannan, and Lianshui. The line meets the Xuzhou–Yancheng high-speed railway at Huai'an East but splits again to continue south. Three stations follow: Baoying, Gaoyou North, and Gaoyou. From the north, both east and west connections to the Nanjing–Qidong railway are provided, but no connection is provided from the south. The line then serves Yangzhou East. The line then passes over the Wufengshan Yangtze River Bridge before heading west and serving Dagang South. At its southern terminus Dantu, the line joins the Shanghai–Nanjing intercity railway.

Stations

More information Station Name, Chinese ...

References

  1. "关于新建连云港至镇江铁路可行性研究报告的批复(发改基础[2014]2227 )". 2014-11-05. Archived from the original on 2014-11-05. Retrieved 2020-08-30.
  2. "连淮扬镇铁路即将开通,城市发展迎新机". Gaotie.cn. 29 November 2020. Retrieved 29 November 2020.
  3. IT之家 (2020-12-11). "中国铁路:连镇高铁今天全线通车,五峰山长江大桥同步投用". finance.sina.com.cn. Retrieved 2020-12-11.



Share this article:

This article uses material from the Wikipedia article Lianyungang–Zhenjiang_high-speed_railway, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.