Line_6_(Beijing_Subway)

Line 6 (Beijing Subway)

Line 6 (Beijing Subway)

Railway line in Beijing, China


Line 6 of the Beijing Subway (Chinese: 北京地铁6号线; pinyin: běijīng dìtiě liùhào xiàn) is a rapid transit line in Beijing. The line runs from Jin'anqiao in Shijingshan District to Lucheng in Tongzhou District. It serves important residential areas such as Changying, Chaoqing, and Dingfuzhuang,[5] in addition to important commercial and business areas such as Financial Street, Beijing CBD and the sub-administrative center in Tongzhou District.[6][7][8] Like Line 7, Line 6 provides relief to the parallel Line 1, which is the second most used subway line in Beijing, after Line 10. Line 6 is the second longest subway line in Beijing (only Line 10 is longer). A complete journey from end to end takes about an hour and 25 minutes on a local train and express trains reducing end to end travel time by 7 minutes.[9]

Quick Facts Overview, Other name(s) ...

Line 6 uses 8-car Type B train sets accommodating 1,960 people. Such trains are only found on lines 6 and 7.[10] The trains are capable of reaching the speed of 100 km/h (62 mph). Stations to the east of the 3rd Ring Road to Tongzhou are more widely spaced, the furthest being 4 km (2.5 mi) apart. Line 6 also has the deepest station in the network, Dongsi station, which is 34 metres (112 ft) underground.[11] The line is the first line to 1500 V overhead catenary as opposed to 750 V third rail used on all earlier lines.[12] Some of the station arrangements were the first of their kind in Beijing. Beijing's first split platform station, Nanluoguxiang station, and stations equipped with passing tracks, opened on Line 6.[6] Line 6's color is earth yellow.

Ridership

Line 6 was projected to have a short term volume of 700,000 passengers per day and a long term daily passenger traffic of 1.4 million passengers. Though due to its alignment through some of Beijing's densest residential neighborhoods and paralleling the overcapacity and busy Line 1, some industry leaders believed that the average daily passenger flow of the line may reach 1.4 million passengers per day sooner than expected.[12] Within the first few months of operation, weekday ridership was at 320,000 passengers. However, by 2014, daily ridership had risen to 700,000 with sections operating at 100% capacity during rush hour. Authorities responded by adding more trains and shortening headway to reduce crowding on the line.[2] By 2019, daily average weekday ridership on Line 6 exceeds 1 million riders.[13]

Stations

Stations from west to east:[14][15]

More information Service Route, Station name ...

History

Planning

Line 6 was originally planned to be an east–west line passing under Chaoyang Avenue continuing straight westward. However, this alignment would make the central section of Line 6 tunnel extremely close to the Forbidden City. Issues of historic conservation and protection were raised against the proposed alignment. To avoid damaging cultural relics in the area, the entire western and middle section of line 6 was shifted 1.5 km (0.93 mi) northward to Ping'an Avenue, forming the route of Line 6 today.[20][21] As of October 2007, Line 6 was planned to feature both express and local stations, but those plans have not been incorporated into the construction of Phase I.[22] Line 6 started construction on December 8, 2007, as one of the "horizontal" east–west lines of the "three-ring, four horizontal and five vertical and seven radial" Beijing Subway masterplan.[23] Construction is planned in three phases, the first phase in central Beijing, followed by extensions into the eastern and western suburbs.

Phase I

Route map of Line 6 Phase I

In Phase I, Line 6 runs 30 km (19 mi) from Haidian Wuluju in Haidian District to Caofang in Chaoyang District following Linglong Road, Sanlihe Road, Chaoyang North Road, the west bank of the Grand Canal, and Yunhe East Road. In Phase I, there were 21 stations, including Erligou station, which opened on 18 March 2023.

Construction began in December 2007 and was completed in 2012. On March 22, 2010, the tunneling work on Line 6 commenced near Shilipu in Chaoyang District.[24] Total investment for Phase I was estimated at ¥19.7 billion.[15]

Line 6 in Phase I was originally slated to have elevated tracks for 7 km (4.3 mi), east of the 5th Ring Road, from Dingfuzhuang and Changying. After residents along the route raised concerns about train noise, planners reconsidered and ultimately decided to keep all of Phase I underground.[25][26][27] This made the first phase of Line 6 completely underground.[28]

Phase II (eastern extension)

Route map of Line 6 Phase I & Phase II

As of November 2010, plans for Phase II contained plans for distinct express and local stations.[29] In Phase II, which opened in 2014, Line 6 was extended further east by about 12.8 km (8.0 mi) through six stations from Caofang to Lucheng in Tongzhou District. Beiyunhedong station opened on 30 December 2018. Like Phase I, the Phase II track is entirely underground.

The extension was designed to have express and local services using passing tracks at select stations.[30] However, due to a shortage of rolling stock, express services have yet to be implemented when the Phase II opens in 2014. In 2018, the government announced that sufficient rolling stock had arrived to begin implementing an express service.[31][32] Express services started operating on March 31, 2020.[9]

Phase III (western extension)

Route map of Line 6 Phase I & Phase II & Phase III

Line 6 was originally planned to terminate at Cishousi station with Line S1 continuing the line westward. In 2011, because of issues of low capacity and electromagnetic radiation concerns of Maglev technology, city planning authorities proposed to detach several stations from Line S1. This would extend Line 6 for 10.556 km (6.559 mi)[33] west with six stations from Jin'anqiao to Haidian Wuluju (the western terminus of Phase I).[34][35] All stations are underground.[36] This replaced the Line S1 section between Cishousi and Pingguoyuan station.[37] Later the plan was revised with Line 6 being further extended westward beyond Pingguoyuan to Jin'anqiao station, paralleling Line S1.[36] The revision was formalized and submitted to the National Development and Reform Commission for review in March 2012.[36] Phase III opened in 2018, along with Beiyunhedong station, a Phase II station.

Plans for an interchange with Line 1 at Pingguoyuan were delayed by a renovation of the station. When Line 6 Phase III entered operation, Pingguoyuan station was not opened. In December 2021, the station was opened as an interchange between Line 6 and Line S1. The station for Line 1 will open in 2024.

Opening timeline

More information Segment, Commencement ...

Future development

South extension of Phase II

The one-station Southern extension of Phase II from Lucheng to Dongxiaoyingnan will be 2.066 km in length.[19] Construction started on 30 August 2022. It is expected to open in 2025.[18]

Rolling stock

More information Model, Image ...

References

  1. 客流信息. Beijing Subway. Retrieved 2015-03-20.
  2. 晚高峰加小圈车 地铁6号线满载率降12%. 首都之窗. 2014-08-22. Archived from the original on 2015-01-05. Retrieved 2014-09-14.
  3. "北京轨道交通日客运量首破1300万人次". 中国新闻社. 2018-07-14. Retrieved 2018-07-14.
  4. 6号线助力朝北新盘崛起. 2012-11-30. Archived from the original on 2015-05-09. Retrieved 2012-12-29.
  5. 轨道交通6号线预计年底试运营 五项第一彰显北京地铁新奇迹. Beijing Municipal Transportation Committee (北京市交通委员会). 2012-09-26. Archived from the original on 2012-11-11. Retrieved 2012-09-26.
  6. 北京地铁6号线西延通过专家评审 全长52公里共33站. 2012-11-14. Archived from the original on 2013-01-12. Retrieved 2012-12-29.
  7. Wen Ru (温薷); Wang Jianing (王嘉宁) (2013-03-15). 地铁六号线二期拟增至8站点. Retrieved 2013-03-16.
  8. 4条地铁线将装屏蔽门. 法制晚报. 2010-01-20. Archived from the original on 2011-07-21. Retrieved 2012-08-24.
  9. New Beijing subway to ease traffic congestion, Wu Wenjie, deputy director of China Railway Tunnel Group, China Daily. Reporter ZHENG Xin. 2012-11-26.
  10. 四条地铁新线12月28日同步开通(图). 163.com. 2012-08-31. Archived from the original on 2016-03-04. Retrieved 2012-09-06.
  11. 孙福亮, 马毅林. "纵观北京地铁十年客流变化(2010-2019)". Weixin Official Accounts Platform. Retrieved 2021-05-24.
  12. "北京地铁线路图". 北京地铁. Archived from the original on 2021-12-31. Retrieved 2021-12-31.
  13. "6号线 | 北京地铁官方网站". www.bjsubway.com. Retrieved 2020-04-24.
  14. "6号线路网车站站间距信息". Archived from the original on 2020-05-08. Retrieved 2020-04-29.
  15. Archived copy 《超级工程》第三集《北京地铁网络》. China Central Television. Event occurs at 07:20. Archived from the original on 2013-01-01. Retrieved 2012-12-29.{{cite AV media}}: CS1 maint: archived copy as title (link)
  16. 2012年九月份科普论坛报告会. Archived from the original on 2014-09-13. Retrieved 2012-12-29.
  17. 北京地铁6号线方案获批复 将尝试大站快车(图)_TOM新闻 (in Simplified Chinese). 2007-10-30. Archived from the original on 2007-11-02. Retrieved 2008-07-05.
  18. 北京5条新地铁12月8日同时开工建设. 2007-12-08. Archived from the original on December 9, 2007. Retrieved 2012-12-29.
  19. "6号线一期开始"挖地道"". The Beijing News. 2010-03-23. Archived from the original on 2018-08-07.
  20. 轨道交通6号线一期工程规划方案公告. 北京市规划委员会. 2010-01-14. Archived from the original on 2010-12-27. Retrieved 2012-12-29.
  21. (Chinese) 2010-11-18
  22. "两条地铁线路年内将"升级"". 2018-10-18. 西延工程线路全长10.556公里,共设车站6座,分别为金安桥站、苹果园站、杨庄站、西黄村站、廖公庄站、田村站
  23. 北京地铁6号线西延工程变更公示. 中国铁道科学研究院. 2013-11-21. Archived from the original on 2013-12-21. Retrieved 2013-11-21.
  24. 8号线3期6号线西延将开工 2015年总里程666公里. 2011-04-27. Archived from the original on 2011-12-14. Retrieved 2012-12-29.

Share this article: