Line 7 is a northwest–southeast line of the Shanghai Metro network. It connects the Baoshan District of Shanghai with the downtown core as well as the Pudong New Area and the Expo 2010 site. It currently runs from Meilan Lake in Baoshan District to Huamu Road in Pudong, which is near Shanghai New International Expo Center. Qihua Road serves as a terminus for trains returning to Chentai Road depot. The line is colored orange on system maps.

Quick Facts Overview, Other name(s) ...

History

  • Construction began on November 24, 2005.
  • The first section of the line from Huamu Road to Shanghai University opened to the public on December 5, 2009.[2][3]
    • In the first few months of operation, the trains only operated from 9AM-4PM to allow for extended testing of the line.
    • On February 20, 2010, operating hours have been extended to fall in line with the rest of the metro system afterwards.[4][5]
  • On April 20, 2010, Houtan station entered operation.
  • In December 2010, three stations on the northern extension of the line opens.
  • In June 2011, two more stations on the northern extension of the line opens.
  • In July 2014, Qihua Road station entered operation.
More information Shanghai Metro Line 7 opening history, Segment ...

Stations

Service routes

More information Shanghai Metro Line 7 service routes, Routes ...

Important stations

Future expansions

There are no current extensions planned.

Station name change

Headways

More information Shanghai Metro Line 7 headway, Monday - Friday (Working Days) ...

Technology

Rolling Stock

More information Shanghai Metro Line 7 rolling stock, Fleet numbers ...

References

    1. "Metro breaks records" (in Chinese). Shanghai Metro 163 Official. 2019-03-09. Retrieved 2019-03-09.
    2. 乘车指南 > Station信息. Shanghai Metro Official Site. Retrieved 2015-12-17. Instructions: 点击相应线路,选择Station,点击"站层图"可查看相应Station的站台结构。
    3. 沪轨交7号线北延伸段今开通 3站暂不开放. 东方早报. 2010-12-28. Archived from the original on 2017-02-20. Retrieved 2016-07-23.
    4. 7号线祁华路站7月22日起开站迎客. Shanghai Metro Official Site. 2014-07-18. Retrieved 2014-07-27.
    5. 7号线一期12月5日9时试运营 开通上海大学至花木路站. 新民网. 2009-12-02. Archived from the original on 2016-03-05. Retrieved 2016-07-23.
    6. 7号线后滩站4月20开通试运营公告. Shanghai Metro Official Site. 2010-04-19.
    7. "Schedule" (in Chinese). Shanghai Metro. 2021-07-07. Retrieved 2021-07-07.

    Share this article:

    This article uses material from the Wikipedia article Line_7_(Shanghai_Metro), and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.