This is a list of electrical generating stations in Alberta, Canada.

Alberta produces a large share of its electricity through natural gas and a decreasing share of its electricity through coal (the latter were to be phased out by 2023, seven years ahead of the provincial and federal phase-out, but the last units have been delayed until 2024).[1][2] Over the last few years, a booming economy and the deregulation of the electricity market has led to the construction of dozens of new facilitiesprimarily[3] alternatives (cogeneration, waste heat recovery) and renewables (e.g. wind, solar, biomass, biogas)and the retirement of over a dozen coal-fired and older gas-fired units.[3][4]

Fossil fuel

  Facilities partially operational
  Facilities under construction
  Planned facilities
  Decommissioned facilities (year)

Coal

List of all coal power plants in Alberta.

More information Name, Location ...

Natural gas

List of all natural gas power plants in Alberta including cogeneration.

More information Name, Location ...

Renewable

  Facilities under construction
  Planned facilities
  Decommissioned facilities (year)

Biomass, biogas, and waste heat recovery

List of all biomass, biogas and waste heat recovery power plants in Alberta.

More information Name, Location ...

Geothermal

List of all geothermal power stations in Alberta. More than 388,500 MW of geothermal generation potential remains untapped, which is approximately 24 times Alberta's total installed generating capacity in 2019.[81]

More information Name, Location ...

Hydroelectric

List of all hydroelectric power stations power plants in Alberta. More than 11,500 MW of hydroelectric potential remains untapped.[83]

More information Name, Location ...

Wind

List of all wind farms power stations in Alberta.

More information Name, Location ...

Solar

List of all solar power stations in Alberta.

More information Name, Location ...

Storage

Battery

List of all lithium-ion battery storage plants in Alberta.

More information Name, Location ...

Flow battery

List of all flow battery plants in Alberta.

More information Name, Location ...

Pumped hydroelectric

List of all pumped hydroelectric storage plants in Alberta.

More information Name, Location ...

Geomechanical pumped

List of all geomechanical pumped storage plants in Alberta.

More information Name, Location ...

See also

Notes

  1. Stalled As of June 2020 yet still on track; see row references for more information (official update).
  2. Off-grid.
  3. Initially 75 MW; expandable to 400 MW.
  4. Pump-back expansion of existing hydroelectric dam site.

References

  1. Healing, Dan (2020-12-04). "Alberta set to retire coal power by 2023, ahead of 2030 provincial deadline". Global News. Retrieved 2020-12-09.
  2. "Genesee Generating Station Repowering Genesee 1 & 2". Capital Power. Retrieved 21 August 2023.
  3. Government of Alberta, "Electricity Statistics", Alberta Energy, archived from the original on 2010-08-26, retrieved 2010-08-27
  4. Seskus, Tony (2020-09-21). "How Alberta — yes, Alberta — could lead Canada in wind and solar by 2025". CBC News. Retrieved 2021-03-06.
  5. CapitalPower, Genesee 1 and 2, retrieved 2021-08-01
  6. CapitalPower, Genesee 3, retrieved 2021-08-01
  7. ATCO Power, Battle River Coal-Fired Generating Station, archived from the original on 2010-07-27, retrieved 2010-08-27
  8. TransAlta, Keephills 1, retrieved 2022-01-01
  9. TransAlta, Keephills 3, retrieved 2022-01-01
  10. "Sundance". TransAlta Power. Retrieved 2022-01-01.
  11. Alberta Energy Regulator, Coal Demand, retrieved 2020-10-07
  12. TransAlta (2010-04-01), TransAlta fully retires all units of its Wabamun power-plant, retrieved 2010-09-06
  13. Maxim Power Corp., Alberta Power Project (APP), retrieved 2010-08-27
  14. "CCGT Plants in Canada - Alberta", Power Plants Around the World, retrieved 2010-08-22
  15. Jones, Jeffrey (2009-06-23), "Nexen may sell gas, power marketing businesses", Reuters, retrieved 2010-08-27
  16. Heartland Generation, Battle River Generating Station, retrieved 2022-06-02
  17. TransCanada, Assets, retrieved 2010-08-27
  18. Alberta Utilities Commission, Genalta Construction GP Ltd. - AUC.ab.ca (PDF), retrieved 2015-03-08
  19. The Alberta Utilities Commission (2013-05-02), Decision 2013-165 – Genalta Power Systems Inc.; 15 MW natural gas-fired power plant (PDF), retrieved 2015-03-06
  20. Enmax, Calgary Energy Centre, archived from the original on 2011-07-10, retrieved 2010-08-22
  21. The Alberta Utilities Commission (2014-06-19), DA2014-145 – Transfer of Ownership of a 15-MW Gas-Fired Turbine Power Plant (PDF), retrieved 2015-03-05
  22. Kineticor, Cascade Power Project, retrieved 2020-09-07
  23. Alberta, Government of. "Cascade Power Project". majorprojects.alberta.ca. Retrieved 2024-02-26.
  24. Capital Power Corporation, Clover Bar Energy Centre, archived from the original on 2010-09-04, retrieved 2010-08-22
  25. Enmax, Crossfield Energy Centre, retrieved 2010-08-22
  26. "Empress Cogeneration Power Facility". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-10.
  27. TransAlta, Plants in Operation, retrieved 2012-02-28
  28. "Genesee Power Plant Natural Gas Conversion". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-10.
  29. Capital Power, Genesee Generating Station, retrieved 2021-07-10
  30. "Harvest Operations Gas Fired Power Plant". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
  31. Milner Power, H. R. Milner Generating Station, retrieved 2021-08-01
  32. ATCO Power, Joffre Cogeneration Plant, archived from the original on 2010-07-27, retrieved 2010-08-21
  33. The Alberta Utilities Commission (2014-06-20), DA2014-146 – Transfer of Ownership of 15-MW Gas-fired Power Plant (PDF), retrieved 2015-03-05
  34. TransAlta, SemCAMS Cogeneration Project, retrieved 2020-09-07
  35. AESO, Keephills Generating Station 2, retrieved 2021-08-01
  36. TransAlta, Keephills Generating Station 2, retrieved 2021-08-01
  37. ATCO Power, Muskeg River Cogeneration Plant, retrieved 2010-08-27
  38. SaskPower, Cogeneration Stations, retrieved 2010-10-09
  39. Constellation Energy, Northern Prairie Power Project – Project Description (PDF), retrieved 2010-08-27
  40. ATCO Power, Poplar Hill Generating Plant, archived from the original on 2009-02-07, retrieved 2010-08-21
  41. ATCO Power, Primerose Cogeneration Plant, retrieved 2010-08-21
  42. ATCO Power, Rainbow Lake Generating Station 1, 2 and 3, retrieved 2010-08-21
  43. ATCO Power, Rainbow Lake Generating Station 4 and 5, retrieved 2010-08-21
  44. ATCO Power, Scotford Cogeneration Plant, retrieved 2010-08-21
  45. AESO, Sheerness Generating Station, retrieved 2021-08-01
  46. gem.wiki, Sheerness Generating Station, retrieved 2021-08-01
  47. ENMAX, Shepard Energy Centre, retrieved 2015-09-16
  48. ATCO Power, Sturgeon Generating Plant, retrieved 2010-08-21
  49. "Sundance Coal to Gas". TransAlta Power. Retrieved 2021-02-25.
  50. "Three Creeks Power Plant". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
  51. University of Alberta, Heating Plant, retrieved 2011-09-26
  52. University of Calgary, Central Heating and Cooling Plant, retrieved 2019-05-24
  53. University of Calgary, New U of C power plant will slash emissions, retrieved 2019-05-24
  54. ATCO Power, Valleyview 1 and 2 Generating Plants, retrieved 2010-08-21
  55. "Gas- and Oil-Fired Plants in Canada", Power Plants Around the World, archived from the original on 2009-07-19, retrieved 2010-08-22
  56. Capital Power Corporation (2005-07-28), EPCOR to Decommission Clover Bar Generating Station, retrieved 2010-08-27
  57. Alberta Pacific Forest, Chemical Recovery & Utilities, retrieved 2010-08-27
  58. Alberta, Government of. "Bonnybrook WWTP Cogeneration Expansion". majorprojects.alberta.ca. Retrieved 2023-11-17.
  59. Services, Water Resources and Water. "Bonnybrook Wastewater Treatment Plant Upgrades and Expansion". www.calgary.ca. Retrieved 2023-11-17.
  60. "TC Energy — Bear Creek Cogeneration Plant". www.tcenergy.com. Retrieved 2023-10-29.
  61. Capital Power Corporation, Clover Bar Landfill Gas, retrieved 2010-08-27
  62. Daishowa-Marubeni International Ltd, Green Power Enhancement Project, retrieved 2012-10-16
  63. Maxim Power Corp., Gold Creek, Alberta, retrieved 2010-08-27
  64. "Energy - Pellets and Energy Generation | Canfor". www.canfor.com. Retrieved 2023-11-17.
  65. "Whitecourt Energy Efficiency Project". Emissions Reduction Alberta. Retrieved 2023-12-27.
  66. Snook, Andrew (2016-03-31). "Slave Lake creates green power from biogas". Canadian Biomass Magazine. Retrieved 2023-12-27.
  67. Verdant Energy, Dapp Biomass Project, retrieved 2010-08-27
  68. Hager, Heather (2011-10-31). "Power to the People at Dapp". Canadian Biomass Magazine. Retrieved 2023-12-27.
  69. Macquarie Power & Infrastructure Income Fund, Whitecourt, retrieved 2010-08-22
  70. Genaltapower, Genalta Power Aggravated heat recovery, retrieved 2015-03-06
  71. Algonquin Power, Valley Power, retrieved 2010-08-22
  72. Alberta Major Projects, Project Wheatland BioFuel Facility, retrieved 2021-12-10
  73. Alberta Major Projects, East Calgary Landfill Gas to Electricity Facility, retrieved 2021-12-10
  74. Duncanson, Sander; Kennedy, Jessica; Baker, Jesse (2020-11-02). "Alberta government introduces Bill 36: The Geothermal Resource Development Act". Osler, Hoskin & Harcourt. Retrieved 2021-02-06.
  75. "Greenview Geothermal Power Plant (Alberta No. 1)". Alberta Major Projects. Retrieved 2021-01-12.
  76. "Home". AMISK Hydroelectric Project. Retrieved 2021-01-02.
  77. Berrade, David (2020-06-09). "Amisk Hydroelectric Project Update" (PDF).
  78. TransAlta, Barrier Hydroelectric Dam, retrieved 2021-08-01
  79. TransAlta, Bearspaw Hydroelectric Dam, retrieved 2021-08-01
  80. TransAlta, Belly River Hydroelectric Dam, retrieved 2021-08-01
  81. TransAlta, Bighorn Dam, retrieved 2021-08-01
  82. TransAlta, Brazeau Hydroelectric Dam, retrieved 2021-08-01
  83. TransAlta, Cascade Hydroelectric Dam, retrieved 2021-08-01
  84. "IRRICAN POWER GENERAL OVERVIEW" (PDF). St. Mary River Irrigation District. Archived from the original (PDF) on 2012-03-11. Retrieved 2010-08-27.
  85. Algonquin Power, Dickson Dam, retrieved 2010-08-25
  86. TransAlta, Ghost Hydroelectric Dam, retrieved 2021-08-01
  87. TransAlta, Horseshoe Hydroelectric Dam, retrieved 2021-08-01
  88. TransAlta, Interlakes Hydroelectric Dam, retrieved 2021-08-01
  89. TransAlta, Kananaskis Hydroelectric Dam, retrieved 2021-08-01
  90. ATCO Power, Oldman River Hydroelectric Plant, retrieved 2010-08-25
  91. TransAlta, Pocaterra Hydroelectric Dam, retrieved 2021-08-01
  92. TransAlta, Rundle Hydroelectric Dam, retrieved 2021-08-01
  93. TransAlta, Spray Hydroelectric Dam, retrieved 2021-08-01
  94. TransAlta, St. Mary Hydroelectric Dam, retrieved 2021-08-01
  95. TransAlta, Taylor Hydroelectric Dam, retrieved 2021-08-01
  96. TransAlta, Three Sisters Hydroelectric Dam, retrieved 2021-08-01
  97. TransAlta, Waterton Hydroelectric Dam, retrieved 2021-08-01
  98. TransAlta, Ardenville, retrieved 2012-10-02
  99. EDF Renewables, Blackspring Ridge Wind, retrieved 2020-09-06
  100. Enbridge, Blackspring Ridge, retrieved 2020-09-06
  101. TransAlta, Blue Trail, retrieved 2010-08-23
  102. Buffalo Atlee, Buffalo Atlee (Phase 1-4), retrieved 2021-06-05
  103. Alberta, Government of. "Buffalo Atlee Wind Project (Phase 1 - 4)". majorprojects.alberta.ca. Retrieved 2024-01-31.
  104. BluEarth Renewables, Bull Creek Wind, retrieved 2020-09-06
  105. TransAlta, Castle River, retrieved 2010-08-22
  106. Enel Green Power, Castle Rock Ridge 2, retrieved 2020-09-06
  107. Acciona Energía, Own facilities, archived from the original on 2009-01-14, retrieved 2010-08-22
  108. Suncor Energy, Wind Energy, retrieved 2010-08-22
  109. TransAlta, Cowley North, retrieved 2010-08-22
  110. EDF Renewables, Cypress Wind Power Project, retrieved 2021-05-08
  111. Alberta, Government of. "Cypress Wind Power Project". majorprojects.alberta.ca. Retrieved 2023-04-15.
  112. Suncor Energy, Forty Mile Wind Power Project, retrieved 2021-12-10
  113. TransAlta, Garden Plain Wind Projet, retrieved 2023-07-04
  114. NextEra Energy, Ghost Pine Wind Energy Centre Fact Sheet (PDF), retrieved 2012-10-02
  115. Grizzly Bear Wind Power Project, Grizzly Bear Wind Power Project, retrieved 2021-07-05
  116. Capital Power, Halkirk Wind Project, retrieved 2012-10-04
  117. BluEarth Renewables, Hand Hills Wind Project, retrieved 2021-12-10
  118. RES Canada, Hilda Wind, retrieved 2021-12-10
  119. Jenner Wind Project, Jenner Wind Project (Phase 1-3), retrieved 2021-06-05
  120. "New Asset Jenner (JNR1) Notice". AESO. Retrieved 2023-10-29.
  121. "New Asset Jenner (JNR2) Notice". AESO. Retrieved 2023-08-30.
  122. "New Asset Jenner (JNR3) Notice". AESO. Retrieved 2023-10-29.
  123. Enmax, Kettle Hills Wind Farm, retrieved 2010-08-22
  124. Lanfine Wind Power Project, Lanfine Wind Power Project, retrieved 2023-01-20
  125. Alberta, Government of. "Lanfine North Wind Power Project". majorprojects.alberta.ca. Retrieved 2023-04-15.
  126. TransAlta, Macleod Flats, retrieved 2010-08-22
  127. TransAlta, McBride Lake, retrieved 2010-08-22
  128. Enmax, McBride Lake Wind Farm, archived from the original on 2010-07-13, retrieved 2010-08-22
  129. Alberta Wind Energy Corporation, Projects, archived from the original on 2010-04-21, retrieved 2010-08-23
  130. Mainstream RP, Oldman Wind Plant, retrieved 2010-08-22
  131. Paintearth Wind Project, Paintearth Wind Project, retrieved 2023-01-20
  132. Berkshire Hathaway Energy Canada, Rattlesnake Ridge Wind Project, retrieved 2022-02-27
  133. Enel Green Power, Riverview, retrieved 2010-08-22
  134. EDP Renewables, Sharp Hills Wind Farm, retrieved 2021-08-20
  135. TransAlta, Sinnott, retrieved 2010-08-22
  136. TransAlta, Soderglen, retrieved 2010-08-22
  137. Stirling Wind, Stirling-Wind, retrieved 2023-07-04
  138. TransAlta, Summerview, retrieved 2010-08-22
  139. TransAlta, Summerview 2, retrieved 2010-08-22
  140. Enmax, Taber Wind Farm, retrieved 2010-08-22
  141. Capital Power, Whitla Wind, retrieved 2020-09-06
  142. Capital Power, Whitla Wind 2, retrieved 2020-09-07
  143. TransAlta, Windrise, retrieved 2020-11-29
  144. Greengate Power Corporation, Wheatland Wind Project, retrieved 2020-09-07
  145. Suncor Energy, Wind Power, retrieved 2012-10-02
  146. Alberta, Government of. "Forty Mile Wind Farm (Granlea Phase 2)". majorprojects.alberta.ca. Retrieved 2023-12-03.
  147. Enerfin Energy, Winnifred Wind Project, retrieved 2022-07-12
  148. Alberta, Government of. "Winnifred Wind Power Project". majorprojects.alberta.ca. Retrieved 2024-02-26.
  149. "Buffalo Plains Wind Farm". Retrieved 2023-01-20.
  150. Alberta, Government of. "Buffalo Plains Wind Farm".
  151. "Forty Mile Wind Project Phase 1". RES. Retrieved 2023-01-20.
  152. Alberta, Government of. "Forty Mile Wind Project (ACCIONA Energía)". majorprojects.alberta.ca. Retrieved 2023-12-03.
  153. CapitalPower, Halkirk Wind Project Phase 2, retrieved 2021-12-10
  154. Alberta, Government of. "Halkirk Wind Project Phase 2". majorprojects.alberta.ca. Retrieved 2023-12-03.
  155. Capstone Infrastructure, Wild Rose 2 Wind Power Project, retrieved 2022-07-12
  156. Alberta, Government of. "Wild Rose Wind Farm Phase 2". majorprojects.alberta.ca. Retrieved 2024-02-26.
  157. Major Projects Alberta, Tempest Wind Power Project, retrieved 2021-06-05
  158. "Tempest". TransAlta. Retrieved 2023-06-15.
  159. Alberta, Government of. "Northern Valley Wind Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
  160. "Northern Valley Wind". Elemental Energy. Retrieved 2023-12-03.
  161. EDF Renewables, Bull Trail Wind, retrieved 2020-11-29
  162. DP Energy, Barlow Solar Park, retrieved 2020-09-07
  163. Elemental Energy, Brooks Solar, retrieved 2020-09-01
  164. Elemental Energy, Brooks Solar II, retrieved 2020-09-07
  165. Enbridge, Alberta Solar One Project, retrieved 2021-02-25
  166. Morgan Solar Inc, Alberta Solar One, retrieved 2021-02-25
  167. BluEarth Renewables, Burdett Solar Project, retrieved 2020-09-01
  168. "Chappice Lake Solar Storage Project". Elemental Energy. Retrieved 2021-12-10.
  169. Capstone Infrastructure, Claresholm, retrieved 2021-02-25
  170. "Clydesdale Solar". Clydesdale Solar. Retrieved 2023-01-25.
  171. AESO, Coaldale Solar, retrieved 2022-04-18
  172. Kiehlbauch, Pat. "ACFN Green Energy LP". Greenplanet Energy Analytics. Retrieved 2023-04-15.
  173. Solar Krafte, Wrentham Solar Project, retrieved 2020-09-07
  174. DP Energy, Deerfoot Solar Park, retrieved 2020-09-07
  175. "New Asset Deerfoot (DFT1) Notice". AESO. Retrieved 2023-07-21.
  176. Elemental Energy, East Strathmore Solar Project, retrieved 2022-06-02
  177. Canadian Solar, Hays Solar Project, retrieved 2020-11-29
  178. "Hays Solar Facility | Projects". BluEarth Renewables. Retrieved 2023-04-15.
  179. Solar Krafte Utilities, Prairie Sunlight II, retrieved 2020-09-01
  180. Elemental Energy, Innisfail Solar, retrieved 2020-09-01
  181. Canadian Solar, Jenner Solar Project, retrieved 2020-11-29
  182. "Jenner Solar Facility | Projects". BluEarth Renewables. Retrieved 2023-04-15.
  183. PACE Canada LP, Joffre Solar - 47 MW, retrieved 2020-11-29
  184. Epcor, Kisikaw Pisim, retrieved 2020-09-07
  185. Alberta, Government of. "kīsikāw pīsim Solar Farm (formerly E.L. Smith Solar Farm)". majorprojects.alberta.ca. Retrieved 2023-04-15.
  186. DrumhellerMail.com, Pat Kolafa | © (2021-07-08). "Drumheller solar project changes hands". DrumhellerMail. Retrieved 2023-04-15.
  187. AESO, Monarch Solar, retrieved 2022-04-18
  188. "Saddlebrook Solar and Storage Project". TC Energy. Retrieved 2021-07-27.
  189. CBC Canada, Scottford Refinery Solar Farm, retrieved 2021-12-10
  190. Alberta, Government of. "Scotford Refinery Solar Farm". majorprojects.alberta.ca. Retrieved 2024-01-31.
  191. "GL&P". GL&P. Retrieved 2023-12-03.
  192. Alberta, Government of. "Sollair Solar Energy Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
  193. Solar Krafte, Spring Coulee Solar Project, retrieved 2020-09-07
  194. Solar Krafte, Strathmore Solar Farm, retrieved 2020-09-07
  195. "New Asset Stavely (STV1) Notice". AESO. Retrieved 2023-04-30.
  196. Suffield Solar GP Inc, Suffield Solar (PDF), retrieved 2020-09-01
  197. Omstead, Jordan (2020-11-19). "Indigenous-owned solar farm opens in remote northern Alberta community". CBC. Retrieved 2020-11-29.
  198. Greengate Power, Travers Solar, retrieved 2021-08-13
  199. Solar Krafte Utilities, Prairie Sunlight III, retrieved 2020-09-01
  200. BluEarth Renewables, Yellow Lake Solar Project, retrieved 2020-09-07
  201. "BluEarth Renewables". Retrieved 2021-12-10.
  202. "Youngstown Solar Project". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
  203. Alberta, Government of. "Big Sky Solar Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
  204. "Big Sky Solar Project". bigskysolar.ca. Retrieved 2023-12-03.
  205. Solar Krafte, Brooks Solar Farm, retrieved 2021-04-11
  206. Alberta, Government of. "Brooks Solar Farm". majorprojects.alberta.ca. Retrieved 2023-06-13.
  207. "Dunmore Solar Project". Dunmore Solar Project. Retrieved 2021-12-10.
  208. Alberta, Government of. "Dunmore Solar Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
  209. "Enterprise Solar Project". www.enterprise-solar.com. Retrieved 2021-12-10.
  210. "Enterprise Solar". Pattern Energy. Retrieved 2023-12-03.
  211. Greengate, Jurassic Solar +, retrieved 2022-08-21
  212. Alberta, Government of. "Jurassic Solar and Battery Storage". majorprojects.alberta.ca. Retrieved 2024-01-31.
  213. Métis Nation of Alberta, Métis Crossing Solar Farm Project, retrieved 2022-12-23
  214. "Tilley Solar Project". Alberta Major Projects. Government of Alberta. Retrieved 2022-12-23.
  215. Alberta, Government of. "Tilley Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
  216. Solar Krafte, Vauxhall Solar Farm, retrieved 2021-12-10
  217. Alberta, Government of. "Vauxhall Solar Farm". majorprojects.alberta.ca. Retrieved 2024-01-31.
  218. Alberta, Government of. "Vulcan Community Solar Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
  219. Alberta, Government of. "Airport City Solar". majorprojects.alberta.ca. Retrieved 2024-01-31.
  220. PACE Canada LP, Caroline Solar - 9 MW, retrieved 2020-11-29
  221. Alberta, Government of. "Caroline Solar Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
  222. Voltarix Group, Creekside Solar Project, retrieved 2021-12-10
  223. Alberta, Government of. "Creekside Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
  224. "Dolcy | Dolcy Solar Inc". Dolcy Solar. Retrieved 2023-09-19.
  225. Alberta, Government of. "Dolcy Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
  226. Georgetown Solar Project, retrieved 2022-12-23
  227. Alberta, Government of. "Georgetown Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
  228. PACE Canada LP, Hanna Sheerness Solar - 13 MW, retrieved 2020-11-29
  229. Alberta, Government of. "Hanna Sheerness Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
  230. Lathom Solar Project, Lathom Solar Project, retrieved 2021-05-12
  231. Alberta, Government of. "Lathom Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
  232. Luna Solar+ Phase I, retrieved 2022-12-23
  233. Alberta, Government of. "Luna Solar Project (Phase One)". majorprojects.alberta.ca. Retrieved 2024-01-31.
  234. Luna Solar+ Phase II, retrieved 2022-12-23
  235. Alberta, Government of. "Luna Solar Project (Phase Two)". majorprojects.alberta.ca. Retrieved 2024-01-31.
  236. Voltarix Group, Moon Lake Solar Project, retrieved 2021-12-10
  237. Alberta, Government of. "Moon Lake Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
  238. DP Energy, Saamis Solar, retrieved 2022-08-21
  239. Alberta, Government of. "Saamis Solar Farm". majorprojects.alberta.ca. Retrieved 2024-01-31.
  240. EDF Renewable Energy, Vulcan Solar, retrieved 2020-09-07
  241. Alberta, Government of. "Vulcan Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
  242. Voltarix Group, Rocktree Solar Project, retrieved 2021-12-10
  243. "High River Solar". Elemental Energy. Retrieved 2022-08-21.
  244. "The Nova Solar Power Project | Nova solar - about the project". www.novasolarproject.com. Retrieved 2023-05-17.
  245. "Public gets look at Sylvan Lake solar power project - Red Deer Advocate". www.reddeeradvocate.com. 2023-08-18. Retrieved 2023-09-19.
  246. Alberta, Government of. "Kiwetinohk Energy Sylvan Solar Farm". majorprojects.alberta.ca. Retrieved 2024-01-31.
  247. Alberta, Government of. "Homestead Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
  248. "Granum Solar Energy Project". AUC. Retrieved 2024-01-31.
  249. "Aira Solar Project Connection (2461)". AESO. Retrieved 2023-04-24.
  250. "Home". Estuary Solar - Alberta. Retrieved 2023-05-17.
  251. Teric Power Ltd, eReserve1, retrieved 2020-11-29
  252. Teric Power Ltd, eReserve2, retrieved 2020-11-29
  253. Teric Power Ltd, eReserve3, retrieved 2020-11-29
  254. "eReserve7 — Enfinite". Enfinite. Retrieved 2024-01-12.
  255. "eReserve8 — Enfinite". Enfinite. Retrieved 2024-01-12.
  256. "eReserve9 — Enfinite". Enfinite. Retrieved 2024-01-12.
  257. TransAlta, WindCharger Battery Storage, retrieved 2020-09-06
  258. TransAlta, WaterCharger Battery Storage, retrieved 2022-08-27
  259. Teric, Whitla Storage Project Storage, retrieved 2024-01-25
  260. Strand, Stephen (2024-01-30). "The Saddlebrook Solar and Storage project is moving onto phase two". Okotoks Online. Retrieved 2024-02-01. Phase two is expected to be completed by the end of the year.
  261. Turning Point Generation, The Canyon Creek Project, retrieved 2020-11-29
  262. Masha Scheele, Canyon Creek Project eyes 2021 build, retrieved 2020-11-29
  263. "Management's Discussion and Analysis" (PDF). TransAlta. March 2019. p. 1. Retrieved 2020-02-06.
  264. "TransAlta Renewables Inc. Investor Presentation" (PDF). TransAlta Renewables. March 2018. pp. 19–22. Retrieved 2021-02-06.
  265. Shumkov, Ivan (2021-06-18). "Quidnet Energy plans multi-gigawatt geologic storage project in Alberta". Renewables Now. Retrieved 2021-07-22.

Share this article:

This article uses material from the Wikipedia article List_of_generating_stations_in_Alberta, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.