S1_line_(Beijing_Subway)

Line S1 (Beijing Subway)

Line S1 (Beijing Subway)

Maglev line in Beijing, China


Line S1[7] (Chinese: 北京地铁S1线; pinyin: běijīng dìtiě S-yī xiàn) of the Beijing Subway is a medium-low speed maglev line. It is operated by the Beijing Mass Transit Railway Operation Corporation Limited. The line was opened on 30 December 2017. It starts from Pingguoyuan in Shijingshan District and goes west towards Shichang in Mentougou District.

Quick Facts Overview, Other name(s) ...

Description

The line uses a medium-low speed magnetic levitation technology which can give a top speed of 105 km/h (65 mph).[8][9] The actual operating speed of the line is either 80 or 100 km/h (50 or 62 mph).[10][6]

The line is 10.236 km (6.360 mi) long, with 9.953 km (6.185 mi) elevated and 0.283 km (0.176 mi) underground. There are eight stations. [11]

Six-coach maglev trains were built by the CRRC Tangshan, a subsidiary of CRRC.[12] It is China's third commercial maglev train in operation.[12] Line S1 is part of Beijing's attempts to tackle environmental problems caused by heavy car use, coal burning and fast urbanization by upgrading its urban rail systems.[12]

The Line S1 designation is a holdover from a defunct plan to build several suburban railway lines in Beijing. Line S1 was envisioned to reuse the Jingmen Railway connecting Cishousi station to Mentougou District.[13] That plan was abandoned and the section between Pingguoyuan and Cishousi stations was replaced with Phase 3 of Line 6, and the other section was replaced with today's Maglev S1 Line.

History

The under construction Yongding River Bridge of Line S1.

Construction of the line began on April 20, 2015.[14] The line was completed west of the Yongding River on March 31, 2017,[15] and the initial section from Jin'anqiao to Shichang opened on December 30, 2017.[16]

When the Line S1 originally opened in 2017, it was not connected to the rest of the subway network. With the opening of Line 6 Phase 3 on 30 December 2018, passengers can transfer to Line 6 at Jin'anqiao.

In July 2021, a major bridge was completed, and the opening of the extension to Pingguoyuan planned for the end of the year.[17] The extension opened on December 31, 2021.

More information Segment, Commencement ...

Stations

More information Station Name, Connections ...

Rolling Stock

Being the only maglev line, the rolling stock is incompatible with any other line in the system. The rolling stock was made by CRRC Tangshan.[12] Trains consist of 6 cars, with the train as a whole being 89 meters (292 ft 0 in) long and 3 meters (9 ft 10 in) wide, each car having. The top speed of the trains is 105 km/h (65 mph), with the operating speed being either 80 or 100 km/h (50 or 62 mph).[8][9][10][6]


References

  1. simplified Chinese: 门头沟线; traditional Chinese: 門頭溝線; pinyin: Méntóugōu Xiàn
  2. 大台线; 大台線; Dàtái Xiàn
  3. 北京低速磁悬浮; 北京低速磁懸浮; Běijīng Dīsù Cíxuánfú
  4. 北京磁浮; Běijīng Cífú
  5. "北京地铁S1线苹果园站即将开通,可与6号线换乘". 线路里程10.2公里
  6. "JPG格式线路图下载 | 北京地铁官方网站". Beijing Subway. Retrieved 1 January 2021.
  7. NAN, ZHONG (19 February 2014). "Maglev trains speeding toward greener future". China Daily. Retrieved 4 January 2015.

Share this article:

This article uses material from the Wikipedia article S1_line_(Beijing_Subway), and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.