STS-44

STS-44

STS-44

1991 American crewed spaceflight to deploy DSP-16


STS-44 was a NASA Space Shuttle mission using Atlantis that launched on November 24, 1991. It was a U.S. Department of Defense (DoD) space mission.

Quick Facts Names, Mission type ...

Crew

More information Position, Astronaut ...

Backup crew

More information Position, Astronaut ...

Crew seating arrangements

More information Seat, Launch ...

Mission highlights

The launch was on November 24, 1991, at 23:44:00 UTC. A launch set for November 19, 1991, was delayed due to replacement and testing of a malfunctioning redundant inertial measurement unit on the Inertial Upper Stage (IUS) booster attached to the Defense Support Program (DSP) satellite. The launch was reset for November 24 and was delayed by 13 minutes to allow an orbiting spacecraft to pass and to allow external tank liquid oxygen replenishment after minor repairs to a valve in the liquid oxygen replenishment system in the mobile launcher platform. Launch weight was 117,766 kilograms (259,630 lb).

The mission was dedicated to the Department of Defense. The unclassified payload included a Defense Support Program (DSP) satellite, DSP-16 attached to Inertial Upper Stage (IUS-14), deployed on flight day one. Cargo bay and middeck payloads included the Interim Operational Contamination Monitor (IOCM), Terra-Scout, Military Man in Space (M88-1), Air Force Maui Optical Site (AMOS), Cosmic Radiation Effects and Activation Monitor (CREAM), Shuttle Activation Monitor (SAM), Radiation Monitoring Equipment (RME III), Visual Function Tester (VFT-1), Bioreactor Flow, and Extended Duration Orbiter Medical Project, a series of investigations in support of Extended Duration Orbiter. The Ultraviolet Plume Instrument (UVPI) experiment was located onboard the previously-launched LACE satellite, and could've been pointed at Atlantis on-orbit to observe the shuttle's thruster findings. However, no opportunities or intersections occurred during this mission.[2]

The landing was on December 1, 1991, at 22:34:44 UTC, Runway 5, Edwards Air Force Base, California. The rollout distance was 3,411 m (11,191 ft), and the rollout time was 107 seconds. The landing weight was 87,918 kg (193,826 lb). The landing was originally scheduled for Kennedy Space Center on December 4, 1991, but the ten-day mission was shortened and the landing rescheduled following the November 30, 1991, on-orbit failure of one of three orbiter inertial measurement units.[3] The lengthy rollout was due to minimal braking for test. Atlantis returned to Kennedy on December 8, 1991. This was also the final shuttle landing on a dry lake bed runway.

Wake-up calls

NASA began a tradition of playing music to astronauts during the Project Gemini, and first used music to wake up a flight crew during Apollo 15.[4] Each track is specially chosen, often by the astronauts' families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.

More information Day, Song ...

See also


References

  1. "STS-44". Spacefacts. Retrieved February 26, 2014.
  2. Fricke, Robert W. (January 1992). STS-47 Space Shuttle Mission Report (PDF) (Report). Houston, Texas: Lockheed Engineering and Sciences Company - National Aeronautics and Space Administration (published January 1, 1992). p. 20. NASA-TM-108735. Retrieved February 11, 2024.
  3. Fries, Colin. "Chronology of wakeup calls" (PDF). Public Domain This article incorporates text from this source, which is in the public domain.

Share this article:

This article uses material from the Wikipedia article STS-44, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.