Mercury-Redstone_4_July_19_launch_attempt_61-MR4-65.jpg


Summary

Description
English: Mercury-Redstone 4 in the final minutes of the countdown for the July 19 launch attempt. The launch was scrubbed due to weather with only 10 minutes 30 seconds remaining in the countdown. In the background is the rocket's service structure, which was moved to the edge of the pad at 60 minutes before launch. Shortly thereafter, the "cherry picker" was stationed at the spacecraft's hatch to permit emergency exit of the pilot, if necessary.
Date
Source

Kennedy Space Center Photo Archive, http://science.ksc.nasa.gov/gallery/photos/1961/captions/61-MR4-65.html .

(A lower-quality, slightly less cropped image of this photo is at the JSC Digital Image Collection under photo ID S61-02876 .)
Author NASA
Other versions S61-02876.jpg (lower quality, slightly less cropped)
This image or video was catalogued by Johnson Space Center of the United States National Aeronautics and Space Administration (NASA) under Photo ID: S61-02876 .

This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing .
Other languages:

Licensing

Public domain This file is in the public domain in the United States because it was solely created by NASA . NASA copyright policy states that "NASA material is not protected by copyright unless noted ". (See Template:PD-USGov , NASA copyright policy page or JPL Image Use Policy .)
Warnings:

Captions

Add a one-line explanation of what this file represents

Items portrayed in this file

depicts

19 July 1961

image/jpeg