Power_lines_and_substation_connected_to_the_Kajaki_dam’s_hydroelectric_powerplant.jpg


Summary

Description
English: A series of power lines and substation connected to the Kajaki dam’s hydroelectric powerplant. The U.S. Army Corps of Engineers’ Afghanistan Engineer District-South and Afghan engineers recently completed installation of a primary switch center at the Kajaki dam to resolve electrical problems. (Photo ID: 427479)
Date Taken on 11 July 2011
Source

This image was released by the United States Navy with the ID 110711-N-TH989-192 (next) .
This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing .


العربية বাংলা Deutsch Deutsch (Sie-Form) English español euskara فارسی français italiano 日本語 한국어 македонски മലയാളം Plattdüütsch Nederlands polski پښتو português русский slovenščina svenska Türkçe українська 简体中文 繁體中文 +/−

Author Petty Officer 2nd Class Jonathan Chandler (U.S. Armed Forces)

Licensing

Public domain
This file is a work of a sailor or employee of the U.S. Navy , taken or made as part of that person's official duties. As a work of the U.S. federal government , it is in the public domain in the United States.

Captions

Add a one-line explanation of what this file represents

Items portrayed in this file

depicts

11 July 2011

0.004 second

30 millimetre

image/jpeg