TBM_S-210_Alptransit_Faido_East.jpg
Size of this preview:
800 × 600 pixels
.
Other resolutions:
320 × 240 pixels
|
640 × 480 pixels
|
1,024 × 768 pixels
|
1,280 × 960 pixels
|
1,600 × 1,200 pixels
.
Summary
Description TBM S-210 Alptransit Faido East.jpg |
Head of the S-210 Tunnel boring machine used to excavate the eastern tube of the Gotthard Base tunnel between Bodio and Faido, Canton Ticino, Switzerland
(all roll chisels have already been removed, picture taken 10 days after breakthrough into multi-function station Faido, 2000 m of rock overhead, diameter is 8.80 m / 29 ft., length of the TBM is 400 m / 1312 ft.) |
Date | |
Source | Own work |
Author | Cooper.ch 16:58, 19 September 2006 (UTC) |
Permission
( Reusing this file ) |
hereby released under CC-BY-SA-2.5 |
Licensing
I, the copyright holder of this work, hereby publish it under the following license:
This file is licensed under the
Creative Commons
Attribution-Share Alike 2.5 Generic
license.
-
You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
-
Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.